Friday, 06 March 2009 00:00
LT Technologies has recently designed, manufactured, integrated and started up an E1 grade water system utilizing RO technologies. This validated clean room environment was a challenge as it was part of a new process area for research and development for a global manufacturer . The space restriction requirements caused LT Technologies engineering group to work on a customized skid platform that worked to minimize size and maximize product water production. The IR Buttfusion welding of the PVDF high purity piping was required and the design worked to minimize potential contamination of waters in the treatment cycle.


